ARTICLES

Filter  
Active filters 0
Remove
  

Refine your searches by:

Collections
Economy
Administration - Business
Education
Social Sciences
Research
Technology
Architecture and Urbanism
Computing
Religion
Communication
all records (73)

Languages
English
Spanish
Portuguese
German
French

Countries
Indonesia
USA
Brazil
South Africa
Canada
Denmark
Germany
Turkey, Turkish Republic
Spain
India
all records (72)

Years
2023
2022
2021
2020
2019
2018
2017
2016
2015
2014
all records (24)

Filter  
 
16.103  Articles
1 of 1.611 pages  |  10  records  |  more records»
Este artículo aborda la programación de tareas en el Flexible Job Shop Scheduling Problem (FJSSP). En este sistema de manufactura es necesario incrementar el número de trabajos a procesar debido a las condiciones actuales del sector industrial en donde ex... see more

Job shop scheduling problem (JSSP) has remained a challenge both for the practitioners and the researchers. A JSSP consists of multiple number of machines (m) and jobs (n). As the number of jobs increases, the complexity of the problem increases exponenti... see more

Mebel adalah suatu perabot yang diperlukan seperti barang yang dapat dipindah-pindahkan untuk melengkapi rumah, kantor, dsb. Mebel juga disebut furniture. Bahan yang paling mahal adalah kayu jati. Tradisi membuat kerajinan mebel dan ukir-ukiran kayu jati ... see more

Though ample work has been done in optimization of job shop scheduling problems (JSSPs), very few techniques can satisfy the requirement of modern day workshop i.e. providing multiple schedules that achieve the desired goal. These techniques also do not p... see more

With considering the scheduling objectives such as makespan, machine workload and product cost, a dual resource constrained flexible job shop scheduling problem is described. To solve this problem, a multi-objective evolutionary algorithm based on decompo... see more

In this paper, several concepts and techniques of job-shop scheduling are adjusted and applied to the real-life scheduling problem at a pipe spool fabrication shop. A genetic algorithm (GA) is developed to create a feasible and active schedule for the ope... see more

El problema del scheduling es uno de los problemas más ampliamente tratados en la literatura; sin embargo, es un problema complejo NP hard. Cuando, además, se involucra más de un objetivo, este problema se convierte en uno de los más complejos en el campo... see more

The problem of efficiently scheduling production jobs on several machines is an important consideration when attempting to make effective use of a multimachines system such as a flexible job shop scheduling production system (FJSP). In most of its practic... see more

1 of 1.611 pages  |  10  records  |  more records»