ARTICLES

Filter  
Active filters 0
Remove
  

Refine your searches by:

Collections
Education
Biology
Agronomy and forestry
Research
Technology
Public health
Food and nutrition
Medicine / Sub specialtie
Architecture and Urbanism
Environment
all records (75)

Languages
English
Spanish
Portuguese
French

Countries
Indonesia
USA
Brazil
Ukraine
South Africa
Turkey, Turkish Republic
Pakistan
Romania
India
Denmark
all records (75)

Years
2023
2022
2021
2020
2019
2018
2017
2016
2015
2014
all records (24)

Filter  
 
199.394  Articles
1 of 19.940 pages  |  10  records  |  more records»
Within this research, The problem of scheduling jobs on a single machine is the subject of study to minimize the multi-criteria and multi-objective functions. The first problem, minimizing the multi-criteria, which include Total Completion Time, Total Lat... see more

ENGLISH ABSTRACT: This paper considers the bi-criteria scheduling problem of simultaneously minimising the total completion time and the number of tardy jobs with release dates on a single machine. Since the problem had been classified a... see more

This paper considers a single-machine scheduling problem of multi- operation jobs where each job consists of several operations processed contiguously, rather than being intermingled with the operations of different jobs. That is, the jobs are indivisible... see more

This paper  presents  a  branch  and  bound  algorithm  for  sequencing  a  set  of  n independent  jobs  on  a single  machine  to  minimize sum of the discounted t... see more

This paper considers a single-machine scheduling problem of multi- operation jobs where each job consists of several operations processed contiguously, rather than being intermingled with the operations of different jobs. That is, the jobs are indivisible... see more

ENGLISH ABSTRACT: This paper considers the bi-criteria scheduling problem of simultaneously minimising the total completion time and the number of tardy jobs with release dates on a single machine. Since the problem had been classified a... see more

Here we have n jobs on one machine where the processing times are triangular fuzzy numbers. The jobs are available to process without interruption. The purpose is to find a best sequence of the jobs that minimizes total fuzzy completion times and maximum ... see more

Determining the route of the tourism bus to visit some tourism object not only to minimaze the distance, but also there are another purpose, such as minimization cost, maximizing tourism object, minimizing trip time, and maximizing the visit time in the t... see more

In construction projects, the relationship between project cost and duration, which is one of the main factors of the project, are considered the parameters decision-makers. When a construction schedule is planned by the planners, additional resources are... see more

1 of 19.940 pages  |  10  records  |  more records»