ARTICLES

Filter  
Active filters 0
Remove
  

Refine your searches by:

Collections
Economy
Technology
Education
Research
Agronomy and forestry
Social Sciences
Architecture and Urbanism
Industrial engineer
Administration - Business
Public health
all records (74)

Languages
English
Spanish
Portuguese

Countries
Indonesia
USA
Brazil
South Africa
Italy
Ukraine
Switzerland
Romania
Netherlands
Spain
all records (78)

Years
2023
2022
2021
2020
2019
2018
2017
2016
2015
2014
all records (24)

Filter  
 
193.465  Articles
1 of 19.347 pages  |  10  records  |  more records»
Proyek preservasi jalan dan jembatan Gempol–Pasuruan–Probolinggo merupakan salah satu proyek preservasi yang mengalami perlambatan pekerjaan dikarenakan adanya kegiatan mudik lebaran. Arus mudik lebaran menyebabkan bebe-rapa pekerjaan tidak dapat dilaksan... see more

Pelaksanaan proyek konstruksi berkaitan erat dengan waktu dan biaya dikarenakan suatu proyek konstruksi dibatasi oleh waktu dan biaya yang telah disepakati pada kontrak. Apartemen Kyo Society merupakan hunian modern berkonsep Jepang pertama di Surabaya. A... see more

Konsep nilai hasil memberikan informasi kinerja proyek dan menghasilkan estimasi biaya dan waktu untuk penyelesaian seluruh pekerjaan proyek. Proyek rumah susun PIK Pulo Gadung Tahap II Jakarta Timur mengalami deviasi sebesar -12,70% pada hari ke-441 (min... see more

In this paper, an algorithm for solving interval time-cost tradeoff transportation problemsis presented. In this problem, all the demands are defined as intervalto determine more realistic duration and cost. Mathematical methods can be used to convert the... see more

Completion of the activities within optimal time and cost plays a significant role in construction projects. Recently, project managers have to decrease the total durations and costs of the projects more than before due to the competitive environment. Mos... see more

In construction projects, the relationship between project cost and duration, which is one of the main factors of the project, are considered the parameters decision-makers. When a construction schedule is planned by the planners, additional resources are... see more

Pada Proyek Pembangunan Jalur Ganda Jalan Ka Lintas Selatan Jawa Km 49+500 Sd Km 52+500 Antara Mojokerto Solo (Paket JGMS-9) mengalami keterlambatan dikarenakan shopdrawing pengerjaan proyek belum disetujui. Akibat hal tersebut, perlu dilakukan optimasi p... see more

Given the perishability of cut flowers, logistics plays an important role in keeping the quality of the product in terms of the time the crop travels from harvest to delivery to the final consumer. The trade of this type of flower is common on the coast o... see more

1 of 19.347 pages  |  10  records  |  more records»