ARTICLES

Filter  
Active filters 0
Remove
  

Refine your searches by:

Collections
Mechanical Engineering
Computing
Physical
Construction engineering
Public health
Infrastructure
Architecture and Urbanism
Pure sciences
Education
Civil Engineering

Languages
English

Countries
Russia
Chile
Colombia
Netherlands
Cuba
Ukraine

Years
2020
2018
2016
2014
2003
2000

Filter  
 
14  Articles
1 of 2 pages  |  10  records  |  more records»
The complexity of controlling the road train is due to pronounced nonlinearities, as well as the instability of the control object under reverse motion, often leading to a phenomenon known as jackknifing. Because of this, the task of controlling their mot... see more

The complexity of controlling the road train is due to pronounced nonlinearities, as well as the instability of the control object under reverse motion, often leading to a phenomenon known as jackknifing. Because of this, the task of controlling their mot... see more

The complexity of controlling the road train is due to pronounced nonlinearities, as well as the instability of the control object under reverse motion, often leading to a phenomenon known as jackknifing. Because of this, the task of controlling their mot... see more

The complexity of the control of the road train is due to the pronounced nonlinearities, as well as the instability of the control object during the movement in the backward motion (jackknifing). For the road trains, the location of the towing device behi... see more

Applied Research Associates, Inc. (ARA) is developing a high-speed Rolling Wheel Deflectometer(RWD) under SBIR/FHWA-sponsored research. The current RWD consists of a dual-wheel, single-axle semitrailerequipped with four spot laser mounted on an aluminum b... see more

The development of a methodology for calculating the designed strength of an unconventional kingpin-type load-carrying system for the articulated tractor container carrier on pneumatic wheels is an important and relevant task due to the unique layout of a... see more

The complexity of the control of the road train is due to the pronounced nonlinearities, as well as the instability of the control object during the movement in the backward motion (jackknifing). For the road trains, the location of the towing device behi... see more

The complexity of the control of the road train is due to the pronounced nonlinearities, as well as the instability of the control object during the movement in the backward motion (jackknifing). For the road trains, the location of the towing device behi... see more

1 of 2 pages  |  10  records  |  more records»