ARTICLES

Filter  
Active filters 0
Remove
  

Refine your searches by:

Collections
Research
Public health
Pure sciences
Technology
Biology
Environment
Medicine / Sub specialtie
Physical
Chemistry
Agronomy and forestry
all records (74)

Languages
English
Spanish
German
Portuguese

Countries
Indonesia
USA
Brazil
Switzerland
Italy
Ukraine
India
South Africa
Pakistan
Romania
all records (75)

Years
2023
2022
2021
2020
2019
2018
2017
2016
2015
2014
all records (24)

Filter  
 
9.502  Articles
1 of 951 pages  |  10  records  |  more records»
In the water resource plan, analysis of the peak flood discharge is needed. Until now, there are several synthetic unit hydrograph methods can be used. The problem faced by engineers is determining the right method to be applied. Some engineers use the la... see more

Peak discharge information is indispensable for flood control planning by taking into account the physiographic factors of the watershed. Flood occurs because the capacity of the watershed and river channels is smaller than the flood discharge. One of the... see more

Peak discharge information is indispensable for flood control planning by taking into account the physiographic factors of the watershed. Flood occurs because the capacity of the watershed and river channels is smaller than the flood discharge. One of the... see more

The identification of the best distribution function is essential to estimate a river peak discharge or magnitude of river floods for management of watershed and ecosystems. However, inadequate estimation of the river peak discharge and floods magnitude m... see more

Channel-forming discharges typically are associated with recurrence intervals less than five years and usually less than two years. However, the actual frequency of occurrence of these discharges is often several times more frequent than the statistical e... see more

The work was explored the kinetics of the changes in the components of the liquid from Achilles tendon, that occur in the tissue of the Achilles tendon as a result of processes of autolysis, within 2-3, 4-6, 7-9 and 10-20 days post-mortem period. The gas-... see more

Design flood is one of the important factors for flood risk assessment and water infrastructures planning and development in a certain location. There are several methods to estimate it, one method which has been commonly and widely use is using flood fre... see more

ABSTRAK Kurangnya ketersediaan data hidrograf merupakan kendala bagi perencanaan bangunan air. Kendala ini menjadikan model-model HSS akan memberikan manfaat yang cukup besar. Idealnya setiap DAS mempunyai Hidrograf Satuan dengan ciri tertentu. Studi... see more

1 of 951 pages  |  10  records  |  more records»