ARTICLES

Filter  
Active filters 0
Remove
  

Refine your searches by:

Collections
Economy
Transport engineering
Infrastructure
Library and Museology
Computing
Physical
Mechanical Engineering
Public health
Pure sciences
Electrical and electronic
all records (20)

Languages
English
German

Countries
Ukraine
USA
Denmark
Indonesia
Russia
Netherlands
Austria
Pakistan
Poland

Years
2022
2020
2019
2018
2017
2016
2015
2013
2012
2008
all records (15)

Filter  
 
35  Articles
1 of 5 pages  |  10  records  |  more records»
The modern system of track service maintenance is analysed and improvement of the organization of track repair works is offered on the basis of new parameters.

As far as wear of the rolling stock and the track related to movement of a train on a section occurs during overcoming the resistance to movement of a train, it looks expedient to conduct the account in a database of performed mechanical work of forces of... see more

Questions concerning various methods of lining of a track are stated, the comparative analysis of results of work of systems of lining of a track (ALC, «Navigator», MS VNIIZHT-MATESS) is resulted, prospects of use of a method of calculation of spatial pos... see more

Purpose. The possibilities of railway transport for organizing transportation between the countries of the European Union and Ukraine are not fully utilized, since there are a number of technical differences in transport systems, namely: wheel gauge, char... see more

It is shown that estimation of the rail track by means of the standard deviations of track geometric parameters provides obtaining a more objective picture than using the existing criteria. This will allow better planning of the track repairs.

Abstrak - Dalam teknologi informasi, sistem pengambilan keputusan adalah ilmu komputer yang memungkinkan mesin bekerja seperti manusia. Sistem pengambilan keputusan adalah sistem yang menggunakan basis pengetahuan para ahli di bidangnya (seperti dokter, t... see more

In accordance with the recommendations of specialized professional literature, steel pyramidal-prismatic bunkers are projected for a service life of 20 years. However, in practice this term is often twice, or even three times lower. This is especially tru... see more

Sebuah perusahaan menggunakan beberapa cara agar perushaan tersebut mengalami tingkat produktivitas tinggi. Salah satu metode digunakan dalam peningkatan produktivitas adalah penyeimbangan lintasan produksi pada tiap Perakitan. Penyeimbangan lintasan kerj... see more

The role and place of projects in various arears of social and industrial activity, the life cycle of which is measured by several days or hours, have been analyzed. An example of such specific projects are the solution of tasks in the field of national s... see more

1 of 5 pages  |  10  records  |  more records»