ARTICLE
TITLE

AN APPROACH TO IMPROVING CUSTOMER ON-TIME DELIVERY AGAINST THE ORIGINAL PROMISE DATE

SUMMARY

One of the main challenges that a low-volume high-variety (LVHV) product manufacturing industry faces is to improve customer on-time delivery (OTD) against the original promised date (OPD) in a make-to-order (MTO) situation. A systematic root-cause analysis is carried out in the LVHV industry to find the true root cause and eliminate it. This paper proposes a methodology that incorporates the lean thinking methodology, a lean live tracking (LLT) tool, and cross-functional team (CFT) approaches to improve OTD. These are tested using real-time data from an industrial valve manufacturing LVHV firm, resulting in an average OTD improvement from 30 percent to 90 percent in about eight months.

 Articles related

Mario Luis Chew Hernández,Leopoldo Viveros-Rosas,Verónica Velazquez-Romero    

Agro-industrial decision-making is hampered by several, variously-natured, uncertainties. As uncertainty reduction is expensive, the decision modelling process for these industries must strive to use all available information. However, said inclusive eff... see more


Arash Mohamadi,Sadalah Ebrahimnejad,Roya Soltani,Mohammad Khalilzadeh    

In this study, a new integrated approach is presented to solve the facility layout problem with unequal areas in an open field. This approach includes a two-stage method and a bi-level genetic algorithm. In the first stage of the proposed method, the arr... see more


Willie Krause,Corne Schutte    

This paper proposes design propositions for an open innovation approach for small and medium-sized enterprises based on the open innovation lifecycle framework. The design propositions direct small- and medium-sized enterprises in implementing, executing... see more


Abdullah A Alabdulkarim    

The increasing number of cancer patients, coupled with the development and use of new, efficient medications, has increased the demand for cancer service care. Outpatient chemotherapy clinics (OCCs) are complex facilities, due to the large variability in... see more


Berno Theo Greyling,Wyhan Jooste    

Business process planning and control is important for effectively managing and improving processes relating to the management of physical assets. This is especially true when processes affect the uptime and value creation by physical assets. This articl... see more