ARTICLE
TITLE

ASSESSING PERFORMANCE OF AUTOMOBILE INDUSTRY USING MALMQUIST PRODUCTIVITY INDEX WITH R

SUMMARY

The aim of this study is to measure the performance of the top ten automobile manufacturers for the years 2011 to 2016. After evaluating the data from annual reports, only six manufacturers meet the requirements. The Malmquist productivity index (MPI) is used as the measurement of performance. The MPI consists of two elements: the technical efficiency change index (TECI) and the technological change index (TCI). The ‘productivity’ package in the open-source programming language known as ‘R’ is used to estimate the MPI, TCI, and TECI with input and output orientations. The results suggest that the productivity of the automobile industry increased during the period under evaluation. The average productivity scores for the top three manufacturers are as follows: Toyota (1.4844), Volkswagen (1.3382), and Mercedes-Benz (1.4444).However, there are still some industries whose productivity score is less than 1: Ford (0.9846), Honda (0.9925), and Nissan (0.9999). The newness of this study stems from the use of MPI in the global automobile industry, using R language, an open-source application for processing data.

 Articles related

Viet-Linh TRAN    

The cables are extremely important and vulnerable components in the cable-stayed bridges. Because cable tension is one of the most crucial structural health indicators, therefore, assessing the cable condition based on the cable tension is a major intere... see more


Fauzri Fahimuddin,Mudiono Kasmuri,Rikki Sofyan,Syarif Junaidi,Latha MS    

Corrosion of steel bridges is a major problem because it has the potential to reduce the performance of the structure over its lifetime. One factor that should not be reduced is fracture toughness, so this should be a very important concern in the mainte... see more


Franka Hendra Sukma,Estiningsih Tri Handayani,Supriyono Supriyono    

Based on data on routine maintenance records for Indonesian Commuter Trains from 2015 - 2017, it is known that the number of realized train availability levels is still below the company’s standards and targets. In addition, there is a potential risk of ... see more


Olayinka Mohammed Olabanji,Khumbulani Mpofu    

This paper presents a sustainability assessment of manufacturing processes for transport equipment, using fuzzy grey relational analysis. The metrics or sub-indicators for sustainability indicators and their relative applications in the manufacturing pro... see more


Hussein Al-bayaty,Muna Suddeq Kider,Muna Suddeq Kider,Omar Nsaif Jasim,Muna Suddeq Kider,Ali Shakor,Omar Nsaif Jasim,Omar Nsaif Jasim,Ali Shakor,Ali Shakor    

The load flow study and short circuit analysis can be considered as the backbone of the electrical power network. This study based on real data collected from 12 substations, each substation contains many feeders provide the electricity network of Kirkuk... see more