ARTICLES

Filter  
Active filters 0
Remove
  

Refine your searches by:

Collections
Technology
Industrial engineer
Economy
Computing
Research
Pure sciences
Computing
Architecture and Urbanism
Mathematics
Public health
all records (65)

Languages
English
Spanish
German

Countries
USA
Indonesia
Ukraine
Brazil
Switzerland
Italy
Netherlands
Canada
Russia
Romania
all records (51)

Years
2023
2022
2021
2020
2019
2018
2017
2016
2015
2014
all records (23)

Filter  
 
827  Articles
1 of 84 pages  |  10  records  |  more records»
This paper proposes a hybrid heuristic that combines Variable Neighborhood Search (VNS) with Ant Colony Optimization (ACO) to solve the scheduling problem of nonrelated parallel machines with sequence dependent setup times in order to minimize the makespa... see more

Batik Murni is one of the Small and Medium Enterprises (SMEs) in Madiun Region that produces batik tulis and batik cap. However, the production of Batik Murni has not applied the exact method in production scheduling. This SMEs still uses intuition to mak... see more

En este trabajo se aplica un algoritmo de optimización de colonia de hormigas con límites de feromona superior e inferior denominado Max–Min Ant System, para resolver problemas de programación de una máquina con tiempos de preparación dependientes de la s... see more

En este trabajo se aplica un algoritmo de optimización de colonia de hormigas con límites de feromona superior e inferior denominado Max–Min Ant System, para resolver problemas de programación de una máquina con tiempos de preparación dependientes de la s... see more

This paper deals with no-idle flow shop scheduling problem with the objective of minimizing makespan. A new hybrid metaheuristic is proposed for the scheduling problem solution. The proposed method is compared with the best method reported in the literatu... see more

This paper deals with simultaneous scheduling of machines and tools with alternate machines in a multi machine flexible manufacturing system (FMS) to minimize makespan (MS).  Only one copy of each type of tools is made available due to economic restr... see more

Permutation flowshop scheduling problem under position based learning effect is addressed in this study. Minimization of the maximum completion time is considered for the identified problem. The mathematical programming model is established to find optima... see more

The paper presents the resource–constrained project-scheduling problem with the single execution mode for each activity and makespan (project’s completion time) minimization as objective. Several heuristic procedures for solving the problem have been ... see more

1 of 84 pages  |  10  records  |  more records»