Home  /  Tri Dasa Mega  /  Vol: 23 Núm: 2 Par: 0 (2021)  /  Article
ARTICLE
TITLE

PRELIMINARY ASSESSMENT OF ENGINEERED SAFETY FEATURES AGAINST STATION BLACKOUT IN SELECTED PWR MODELS

SUMMARY

The 2011 Fukushima accident did not prevent countries to construct new nuclear power plants (NPPs) as part of the electricity generation system. Based on the IAEA database, there are a total of 44 units of PWR type NPPs whose constructions are started after 2011. To assess the technology of engineered safety features (ESFs) of the newly constructed PWRs, a study has been conducted as described in this paper, especially in facing the station blackout (SBO) event. It is expected from this study that there are a number of PWR models that can be considered to be constructed in Indonesia from the year of 2020. The scope of the study is PWRs with a limited capacity from 900 to 1100 MWe constructed and operated after 2011 and small-modular type of reactors (SMRs) with the status of at least under licensing. Based on the ESFs design assessment, the passive core decay heat removal has been applied in the most PWR models, which is typically using steam condensing inside heat exchanger within a water tank or by air cooling. From the selected PWR models, the CPR-1000, HPR-1000, AP-1000, and VVER-1000, 1200, 1300 series have the capability to remove the core decay heat passively. The most innovative passive RHR of AP-1000 and the longest passive RHR time period using air cooling in several VVER models are preferred. From the selected SMR designs, the NuScale design and RITM-200 possess more advantages compared to the ACP-100, CAREM-25, and SMART. NuScale represents the model with full-power natural circulation and RITM-200 with forced circulation. NuScale has the longest time period for passive RHR as claimed by the vendor, however the design is still under licensing process. The RITM-200 reactor has a combination of passive air and water-cooling of the heat exchanger and is already under construction.  

 Articles related

febrina ramadhan,Yulia Haryono,hamdunah hamdunah    

Penelitian ini dilatarbelakangi oleh bahan ajar yang ada di SMA PGRI 3 Padang belum dapat membantu siswa untuk memahami masalah dalam kehidupan sehari-hari. Penelitian ini bertujuan untuk mengembangkan LKS berbasis Problem Based Learning (PBL) yang valid... see more

Revista: Pelangi

Hamdunah Hamdunah,Mulia Suryani,Fransisca Isabella Wijaya    

Buku teks belum fasilitasi siswa untuk belajar mandiri serta meningkatkan peran serta siswa dalam belajar, terutama pada materi lingkaran. Permasalahan yang berkaitan dengan lingkaran banyak ditemui dikehidupan sehari-hari siswa, namun materi lingkaran p... see more

Revista: Pelangi

Lovia Lita,Ainil Mardiyah    

Penelitian ini bertujuan untuk merancang bahan ajar yang dapat memfasilitasi kemampuan pemecahan masalah mahasiswa berupa lembar kerja pada mata kuliah matematika dasar. Jenis Penelitian ini adalah penelitian pengembangan dengan menggunakan metode pengem... see more

Revista: Pelangi

Ofianto Ofianto,Tri Zahra Ningsih    

Chronological thinking skills are one of the most critical goals in learning history, distinguishing it from other sciences. This skill is not a natural skill that already exists in students but is a skill that needs to be developed in students, especial... see more


Eugene Tikhonov,Donat Shneps-Shneppe,Dmitry Namiot,Manfred Sneps-Sneppe    

Possible characteristics of railway communication networks at the stage of coverage growth as potential successors of GSM-R are analyzed in the paper. Communication in such networks can be provided by terrestrial base stations and/or by mobile satellite ... see more