SUMMARY

This research works objectives were to conduct a work study of subbase course of road construction and implement productivity analysis with EZStrobe simulation system. The study had divided construction process into 3 parts. Each part of the process was simulated with EZStrobe to find optimum construction team members with minimum unit cost. These optimum team members were used in simulation model of each part to determine basic time with 95% confident interval and 5% limit of error. Then, the standard time and productivity of each construction team was calculated in various units; production per hour (cu.m./hr., sq.m./hr.), daily production (cu.m./day, sq.m./day, m. of road/day), and number of hour required per section of subbase course construction (200 m. in length). After that, the overall process simulation model including Part 1 to Part 3 was created, representing for all 26 sections of subbase course construction. The analysis results showed that optimum team combination of Team1, Team2 and Team3 for the minimum unit cost of subbase construction was 2-1-2; and for the minimum duration of construction was 3-2-3. The outcomes of this research pointed out that, with EZStrobe simulation system, the productivity management could be done effectively by conducting work study at project site and simulating for alternative resources management plan to determine for optimum construction teams according to the desired project goals.

 Articles related

Santhosh Loganathan, Perry Forsythe, Satyanarayana N Kalidindi    

The nature of construction work processes allow crews and workers to follow their own practices in how they plan, organise and coordinate work. However, there is little research into the nature of crew work practices. This paper aims to unveil the influe... see more


Will Chancellor    

Australian construction productivity has grown slowly since 1985 and remains arguably stagnant. The importance of this study is therefore to examine several factors through to be drivers of construction productivity and to understand possible avenues for... see more


Argaw Tarekegn Gurmu, Ajibade Ayodeji Aibinu, Toong Khuan Chan    

This research investigates management practices that have the potential to enhance productivity in building projects by focusing on construction methods. In phase 1 of the study, face-to-face interviews with nineteen experts were conducted to identify th... see more


Malcolm Abbott, Chris Carson    

In recent years there has been increasing interest in the productivity and efficiency of the construction industry in New Zealand.  In part this interest has manifested itself in the increased use of numerous statistical techniques to determine the ... see more


Rick Best    

In a report published in June 2012 the Business Council of Australia (BCA) reported that it costs considerably more to build a variety of types of infrastructure in Australia than it does in the US. Airports (90% more costly) and hospitals (62%) were quo... see more