ARTICLE
TITLE

Investigation on factors causing construction delay and their effects on the development of Oman’s construction industry

SUMMARY

Construction delay in projects is a common manifestation in the construction industry. Delay in construction will lead to a bad relationship between the parties involved and will also lead to an increase in the allocated completion time. Delay in the ongoing project might result in the loss of the money, time and other facilities by the client and cause a lot of financial damage to the contractor due to its investment in the purchase of equipment, construction materials and the hire of skilled workers. Delay in construction is a common problem that occurs mostly due to the unforeseen problems during the design & construction stages which often lead to delays in the completion of the project. Oman’s construction industry is one of the most important industries for the country’s economic development and growth. In this study, analysis of some available literature was conducted, and a questionnaire survey was floated among contractors, consultants, clients, project managers, and engineers involved in construction projects. All the collected responses were evaluated by using SPSS. The results of the study identified a total of 60 causes of delay out of which three factors have a “High” significance level for construction delays. These factors of “High” significance were associated with “Client related issues only” in which the initial design was altered by the client, delaying in deciding by the client and, scope change by the client. Majority of the delay (84 %) was observed to be lying in the range of 1-2 years. This study also recognized the effect and minimization of regular delay and delay resulted due to Covid-19. Minimizing construction delay criteria can be managed by having a proper control system in the project time and funds

 Articles related

Qosai Sahib Radi Marshdi,Safa A. Hussien,Basim M. Mareai,Zainab S. Al-Khafaji,Ali. A. Shubbar    

Recently, the demands on the concretes with no fines aggregate has been increased as a results of the industry revolution. Many researchers are trying to recycle the concretes and rubble. In addition, the increase in noise in the surrounding environment ... see more


Mahmood T. Yassen,Mohammed R. Hussan,Ali J. Salim,Hussam Alsaedi,Jawad K. Ali    

An entirely new design approach has been employed to create the printed dualband monopole antenna that was the subject of this investigation. The printed monopole antenna construction is the primary component of the suggested design. CPW transmission lin... see more


Shaymaa Abdelghany Mohamed,Mahdisabber Whaib,Marawan Mohammed Hamid,Mohammed Elwi,Wameedh Ghassan Abdul-Hussein    

The most used material in construction is concrete. This study aimed to investigate the impact of recycled aggregate on compressive and tensile strength in concrete. To address the issue of accumulating tons of recycled aggregates, a new method was devel... see more


Fatima Mseer,Nameer Alwash    

The scope of this study is to look at the effect of supplying a non-prismatic cross-section on the flexural strength of one-way continuous slabs reinforced concrete (RC) with two spans under repeated load. The research aims to study the ability of non-pr... see more


D. Priambodo,S Sunarko,W. W. Purwanto    

Safety Investigation of Hazardous Materials Released from The Combined High Temperature Gas Cooled Reactor (HTGR) – Hydrogen Production Plant Using ALOHA software has been carried out. Currently, most of studies for HTGR-hydrogen plant are focused only o... see more

Revista: Atom Indonesia