ARTICLE
TITLE

EVALUASI KEBIJAKAN PERSEDIAAN BAHAN BAKU KANTONG SEMEN UNTUK MENGURANGI BIAYA PERSEDIAAN (Studi Kasus: PT. SOLUSI BANGUN INDONESIA TBK). 10.30988/jmil.v4i2.510

SUMMARY

AbstractThis study aims to evaluate company policy in determining raw material ordering rates which are then compared with the EOQ, POQ, and Min-Max methods. This research uses a quantitive case study method using data obtained from the company. Forecasting is done using WinQSB and MAD, MSE and MAPE software for forecasting accuracy. Based on data processing, the data shows the horizontal pattern and the chosen forecasting method is the Simple Average method. Research shows the EOQ method has an order quantity of 1192 units / order with an order frequency of 11 times a year and has the smallest total inventory cost of the three methods compared which is Rp 269,520,852,781 or almost 50% lower than the total costs incurred by the company using the current method. ROP point has a value of 3395 units with a safety stock value of 106 units.AbstrakPenelitian ini bertujuan untuk mengevaluasi kebijakan perusahaan dalam menentukan tingkat pemesanan bahan baku yang kemudian dibandingkan dengan metode EOQ, POQ dan Min-Max. Penelitian ini menggunakan metode studi kasus kuantitatif dengan menggunakan data yang diperoleh dari perusahaan. Peramalan dilakukan menggunakan perangkat lunak WinQSB dan MAD, MSE dan MAPE untuk akurasi peramalan. Berdasarkan pengolahan data, data menunjukkan pola horizontal dan metode peramalan yang dipilih adalah metode Simple Average. Penelitian ini menunjukkan metode EOQ memiliki jumlah pesanan 1192 unit / pesanan dengan frekuensi pemesanan 11 kali setahun dan memiliki total biaya persediaan terkecil dari ketiga metode yang dibandingkan yaitu Rp 269.520.852 atau hampir 50% lebih rendah dari total biaya yang dikeluarkan oleh perusahaan dengan metode saat ini. Titik ROP memiliki nilai 3395 unit dengan nilai stok pengaman 106 unit.

 Articles related

Wiji Yuwono, M. Elfan Kaukab, Yusqi Mahfud    

Tujuan penelitian ini adalah mengevaluasi waktu dan biaya kegiatan proyek Pembangunan Gedung Kantor Kelurahan Wonorejo Kecamatan Selomerto Kabupaten Wonosobo. Metode PERT menganalisis kemungkinan tercapainya waktu proyek yang telah direncanakan dalam tim... see more



AbstractXYZ company is a large textile dye companies in Indonesia. To reach existing consumers with lower transportation costs, XYZ Company plans to add new warehouses. This study provides an analysis using mathematical modeling for the problem of select... see more


Khairunnisa Khairunnisa,Defiariany Defiariany,Keukeu Rohandi    

To facilitate the processing of thesis management reports, reports assignments, minutes and attendance, an application is needed. Dealing with these needs, an analysis of the processing of student thesis data processing needs to be done so that results a... see more


Widya Ayu Prabasari,Kristina Sisilia    

Perkembangan dunia pariwisata di era digital ini mengalami lonjakan yang sangat besar. Saat ini juga kemampuan ekonomi masyarakat Indonesia terus mengalami pertumbuhan juga mendorong kebutuhan akan melakukan wisata. Oleh karenanya, tidak mengherankan apa... see more



AbstractGood inventory management requires support from a database information system. The problem that occurs in the Untirta Industrial Engineering laboratory is that the inventory management system is still traditional method, that is data recording is... see more