Construction delays causing risks on time and cost - a critical review

SUMMARY

There is an increase in the number of construction projects experiencing extensive delays leading to exceeding initial time and cost budget.  This paper reviews 41 studies around the world which surveyed the delay factors and classified them into Groups.  The main purpose of this paper is to review literature, each of which have categorized the causes that are responsible for time delays and cost overrun in projects. The collected list has 113 causes for delays categorized in to 18 different groups.  Most of the researches have analysed the responses from the Questionnaire survey.    The collected data are used to rank the problem.  The data are further used to investigate and analyse Important Index, Frequency Index, Severity Index, Relative Important Index, Relative Importance Weight, Weighted Average, Mean, Standard Deviation and Variance.  The collective comparison has revealed that the ranking given by all the researchers is not the same.  Further each and every study has different rank ratings for the different group of the delays.  This review paper attempts to provide an updated compilation of the earlier studies on ranking of the delay causers, which are never similar and constant for universal projects.  It is concluded that a separate study is required for identifying the factors causing delay for projects operated in Sabah, East Malaysia.

 Articles related

Thanuja Ramachandra, James Olabode Bamidele Rotimi    

Payment delays and losses persist in the construction industry and continue to be a key concern to industry practitioners. Therefore an exploration of the key causes of payment delays and losses is undertaken in this study with the ultimate objective of ... see more


Ibrahim Mahamid    

The construction sector is one of the key economic sectors and is the main force motivating the Palestinian national economy. However, it suffers from number of problems that affect time, cost and quality performances. This study aims at identifying the ... see more


Thanuja Ramachandra, James Olabode Rotimi    

Delay and loss of payment is a serious problem in the construction industry of many countries. These affect the cash flow of contractors which is critical to meeting their financial obligations. Payment defaults by the principal leads to insolvency of co... see more


Frank DK Fugar, Adwoa B Agyakwah-Baah    

This study investigates the causes of delay of building construction projects in Ghana to determine the most important according to the key project participants; clients, consultants, and contractors. Thirty-two possible causes of delay were identified f... see more


Hong Xiao, David Proverbs    

Construction cost is a major concern to both clients and contractors. Based on a hypotheticalconstruction project (a six-storey concrete framed office building), cost and otherrelated information was collected through a survey of contractors in Japan, th... see more