ARTICLE
TITLE

PERENCANAAN PEMBANGUNAN WILAYAH BERDASARKAN KONSEP PRODUKTIFITAS UNGGULAN 10.29122/jtl.v8i2.423

SUMMARY

Productivity is a ratio between an output and another input, such as: labor,and land. To solve the problem of resource limitation, it is necessary todevelop some approaches, such as priority commodity approach and priorityterritory development approach. Some factors influencing the problem ofnon optimal development are very low development of Iceal prioritycommodity and undevelopment of priority area. Several policies andstrategies that are needed in order to increase an area productivity is through priority sector / commodity development which is adjusted with carrying capacity of adjacent area, labor mobilization and human resourcedevelopment. In order to support the direction of those policy and strategy,some programs that are developed are: reorientation program of localeconomic development that based on priority commodity, developmentprogram of strategic area and human resources development, quantitycallyand qualitycally. In order to get a huge output to increase the people welfare, it is necessary to choose a right local priority commodity, thus others priority sectors will also be developed.

 Articles related

Fahmi Shofi Aulia,Fuddoly Fuddoly,Dyah Iriani WidyastutiDOI: 10.12962/j23373539.v9i1.50769    

Indonesia merupakan Negara yang memiliki cadangan gas bumi yang besar. Sampai saat ini gas alam yang berasal di Indonesia diolah menjadi produk LNG (liquefied natural gas). LNG merupakan gas alam yang telah diolah kedalam bentuk cair yang telah dikondens... see more


Alfian Ravi Roshan,Hera Widyastuti,Data IranataDOI: 10.12962/j23373539.v11i2.107635    

Kemacetan lalu lintas menjadi permasalahan sehari – hari dalam ruas jalan nasional Ciawi – Sukabumi. Hal ini mendorong Pemerintah Pusat untuk membangun jaringan jalan bebas hambatan atau jalan tol Ciawi – Sukabumi. Jalan tol ini dibangun untuk membantu m... see more


Hafizh Afif Rinanto,Budi RahardjoDOI: 10.12962/j23373539.v11i2.84979    

Perkembangan kereta api didunia sudah sangat pesat dapat dilihat dengan berkembangnya kereta cepat yang dapat mencapai kecepatan lebih dari dua ratus km/jam. Namun perkembangan kereta cepat di Indonesia untuk saat ini hanya perencanaan kereta cepat Jakar... see more


Ranindya Sekarayu,Wimala Lalitya Dhanistha,Suntoyo SuntoyoDOI: 10.12962/j23373539.v11i3.88509    

Kerusakan CSD Galileo menyebabkan pihak kontraktor menghentikan kerja sama dengan Sub-contractor A dan digantikan dengan Sub-contractor B menggunakan CSD Julong untuk melakukan pengerukan alur pelayaran dan kolam fast boat Pelabuhan Bias Munjul. Pengeruk... see more


Fauzi Nur Rochim,Agus SlametDOI: 10.12962/j23373539.v11i3.91778    

Sentra Wisata Kuliner (SWK) Bratang Binangun merupakan salah satu dari 25 SWK di Surabaya yang masih belum memiliki IPAL. Dalam kegiatan sehari-hari, air limbah yang dihasilkan dari SWK Bratang Binangun berasal dari kegiatan memasak, proses pencucian, se... see more