ARTICLE
TITLE

DETERMINATION OF THE COST COMPONENT IN THE SOCIAL COST-BENEFIT ANALYSIS OF ROAD PROJECTS IN SOUTH AFRICA

SUMMARY

The article deals with the preferred approach to determine the cost component in the social cost-benefit analysis (SCBA) of road projects in South Africa. The article is in four parts. The first part, the introduction, provides the reasons why investment cost should be identified as a single cost entity in the SCBA of a road project, regardless of the criteria according to which a project is adjudicated. The second part discusses the principles that guide the determination of the social opportunity costs (SOC) of road projects. The third part identifies the two items that form the cost component of the SCBA of road projects; the SOC of (i) the land required to accommodate the road reserve, and (ii) the construction of the road. The cost component of the latter is sub-divided into labour, plant, equipment, fuel, materials, and normal profit. The section also details a recommended procedure to convert the financial budget of a road construction project to an estimate of its SOC. The fourth section draws some conclusions from the study.

 Articles related

Odalys Martínez Rodríguez,Santiago Alfredo Dorrbercker Drake    

Los generadores de potencia son de gran importancia para la producción de electricidad. Un fallo en un generador ocasiona la interrupción de su servicio, limitaciones o pérdida total de la energía generada, tiene efectos negativos sobre la economía y afe... see more


Adnan Taher Kareem,Ahmed T. Sadiq,Hasanen S. Abdulah    

Dung’s argumentation frameworks (AF) were introduced in the last century it works with the justification of the argument. This framework analyzes attacks of arguments, it works away on the characteristics of arguments structures and words was used in the... see more


Karthikeyan Arthanary, Karthikeyan Ayyavoo, K Venkatesh Raja, T Pridhar    

Determination  optimum cutting tool position in a tool magazine is a challenging  task  which involves huge searching space. In the present  industry scenario a reducing a nano- seconds in manufacturing process is highly beneficial in... see more


Okeoghene Eboibi    

This paper aims at the determination of the suitability of applying a numerical model of a VAWT for research purpose. A CFD two-dimensional model was created and simulated with fluent code software while the forces and flow field data were monitored and ... see more


H. T. Oladunjoye, O. A. Adenuga, S. A. Adekoya    

The results obtained from the evaluation of elastic properties of some part of Lagos Wetlands were presented for the determination of the competent soil for engineering structures. The study area falls within the reclaimed part of the Lagos wetlands sign... see more