ARTICLE
TITLE

New implementation of Work Sampling Analysis for validating the Present Idle Time Indicator of Maintenance and Ship Repairing Business Line of Cotecmar

SUMMARY

This article is focused on the implementation of the Work Sampling technique at the Science and Technology Corporation for the development of the Naval, Maritime and Riverine Industry – COTECMAR, more specifically in the Production Department of the Maintenance and Ship Repair Management located in Mamonal facilities; in order to know the percentage of idle times in performed productive processes and to identify the main triggers, through the estimation of the proportion of time played in specifics activities in a certain period of time, using instantaneous observations of work areas and employing probability sampling to generalize the findings. 

 Articles related

Sie Ivan Hinman Siehoyono    

Corbion Group Netherlands B.V. is a company specialized in food ingredients such as lactic acid which involves fermentation process. Thus, a system was created to monitor on real-time fermentation process in order to gain insight and control of the proce... see more


Liebrecht Otto,Theuns Dirkse van Schalkwyk,Cornelius Schutte Schutte    

In 2016 Mercedes-Benz SA introduced hybrid vehicles into their East London factory, pioneering high-voltage automotive manufacturing in the country. When the implementation decision was made, the factory was given less than a year to introduce this poten... see more


Ieda Margarete Oro,Carlos Eduardo Facin Lavarda    

The study aims to investigate how the use of Management Control Systems (MCS) occurs in the balance of dynamic tension to implement the innovation strategy as a competitiveness differential in a family business. It is characterized as descriptive researc... see more

Revista: Base

Hussain Ali Mutar,Muayed S. AL-Huseiny    

While Ethereum run in public networks which make the blockchain size large and transaction run time longer than time for private or national network, that led to continuous worries over the expanding size of Ethereum Blockchain, which certainly reduce Cr... see more


C.C. Koorts,P.J. Conradie    

ENGLISH ABSTRACT: With the embracing of neV'( management philosophies or redesigned processes, it is becoming a popular opinion that often the practical problem lies with the implementation of the new concept, rather than with the... see more