SISTEM KELISTRIKAN BERBASIS SOLAR PANEL UNTUK RUMAH NELAYAN TRADISIONAL

SUMMARY

Limitations and the absence of electricity will disrupt the continuity of people activities. This is because electricity is one of the needs of the people and is felt to be very important. The availability of electricity, which is supported by power plants sourced from fossil fuels, certainly burdens the lower middle class community, including the fishing community. The solution that can be implemented to reduce the burden and dependence of the community on fossil fuels as a source of electrical energy is the use of solar energy. Indonesia has good potential when using solar energy as an alternative energy for power generation. This is because Indonesia is a tropical country that has abundant solar energy potential. Thus, this abundant solar resource is expected to meet household-scale electricity needs in remote areas that have not been reached by the State Electricity Company (PLN). PLTS in this service is carried out to meet electricity needs independently in residential homes that will be used day and night. The type of residential house used is a simple house type, with a total daily electrical power requirement of 1.314Wh and added 20% so that the total need is 1,576.8 Wh.

 Articles related

Nanda Dicky Wijayanto,Ontoseno Penangsang,Adi SoeprijantoDOI: 10.12962/j23373539.v1i1.408    

Dalam merancang sebuah sistem kelistrikan industri banyak parameter yang harus dipikirkan terutama dalam masalah proteksi karena proteksi merupakan hal yang sangat penting dalam sistem kelistrikan. Koordinasi sistem proteksi yang baik dapat meningkatkan ... see more


Willy Prasetyadi,Ontoseno Penangsang,Rony Seto WibowoDOI: 10.12962/j23373539.v1i1.158    

Pabrik Semen Tuban merupakan perusahaan industri yang bergerak dibidang produksi semen. Pada tugas akhir ini dianalisis aliran daya dari sistem kelistrikan Pabrik Semen Tuban. Kemudian akan  dilakukan juga analisis harmonisa untuk mengetahui besar d... see more


Firman Aji Prasongko,Ontoseno Penangsang,Margo PujiantaraDOI: 10.12962/j23373539.v1i1.94    

Upaya terakhir untuk menghitung bahaya yang berhubungan dengan potensi bahaya arc flash bergantung pada proteksi arus lebih untuk menghilangkan kondisi saat diberi gangguan. Efektivitas berbagai perangkat ditentukan oleh clearing time terkait dengan gang... see more


Johari Johari,Ontoseno Penangsang,Adi SoeprijantoDOI: 10.12962/j23373539.v1i1.60    

Pemilihan metode pentanahan pada multi generator menjadi pertimbangan penting dalam sebuah industri yang memiliki tegangan menengah. Hal ini dikarenakan seringnya terjadi gangguan ke tanah serta besarnya arus gangguan satu fasa ke tanah pada masing–masin... see more


Victor Bramson Pardede,Margo PujiantaraDOI: 10.12962/j23373539.v10i1.59784    

PT. Pertamina RU II Dumai adalah sebuah perusahaan yang bergerak dalam bidang pengolahan minyak dan gas bumi. Dalam perjalanannya, PT. Pertamina RU II Dumai berencana untuk melakukan integrasi sistem kelistrikan terhadap jaringan PT. PLN untuk memenuhi k... see more