ARTICLE
TITLE

MONTE CARLO SIMULATIONS FOR UNCERTAINTY QUANTIFICATION: MATHEMATICAL FOUNDATION AND IMPLICATION OF UNDERLYING ASSUMPTIONS

SUMMARY

Many problems in petroleum engineering involve solving multivariable complex integrals and analytic calculation is rarely possible in most practical cases. Numerical approximation appears to be practicable. However, majority of existing numerical solution of a D–dimensional integral with a relative accuracy (?) requires a computation time proportional to ?-D. Hence, the use of Ordinary Monte Carlo simulation (OMCS) in uncertainty quantification has gained tremendous attention. In reality, when historical data is available, variables are not independent and identically distributed (iid). The direct sampling of variable under this condition is not expected to be easy and use of OMCS can be erroneous. Methods based on Markov Chains will offer reasonable solution to this problem. This study evaluates simulation methods for quantifying uncertainty in reservoir forecast. The implications of underlying mathematics and assumptions that characterizes them were covered. The p5-p10–p50–p90-p95 uncertainty envelopes from different methods were presented using a case study from Niger Delta. The result is useful for identification and selection of effective tools in uncertainty quantification in the oil industry.

 Articles related

M. Aabid,S Semghouli,A. Choukri    

A pelvimetry examination is sometimes prescribed to a pregnant woman at the end of her pregnancy in order to assess the dimensions of her pelvis prior to childbirth. This examination has long been performed by using X-ray, but is now increasingly being r... see more

Revista: Atom Indonesia

Jadidah Fihriz Nanda,Wimala Lalitya Dhanistha,Silvianita SilvianitaDOI: 10.12962/j23373539.v11i2.88798    

Kebutuhan akan produksi minyak dan gas bumi semakin hari semakin tinggi. Untuk itu dalam memenuhi permintaan tersebut perlu adanya alat transmisi minyak dan gas bumi yang memadai serta aman agar proses distribusi berjalan dengan lancar. Pipa bawah laut a... see more


Francois Jacobus Joubert,Martin Snyman    

In terms of project risk management, ‘systemic risk’ is identified as risks which are artefacts of the environment which a project is executed in, and are related to (i) the project team’s actions, (ii) how project controls are managed and... see more


Muhammad Enggar Wijaya,Mochammad Nuruddin,Efta Dhartikasari    

Increasing efficiency and effectiveness is a fundamental problem for every company. Optimization of raw material inventory is an effort for this problem. PT XYZ is a company engaged in manufacturing various flavors of beverages, one of which is sugar. Th... see more


Novita Purwaningsih,Endroyono Endroyono,Gatot KusrahardjoDOI: 10.12962/j23373539.v4i1.8658    

Dari simulasi yang telah dilakukan, optimasi dengan metode monte carlo menunjukkan hasil persentase coverage yang paling bagus yaitu 71.96% dan yang paling buruk zona 7 yaitu 58,81% untuk skala nasional zona 4. Jumlah pemancar dapat dikurangi sebanyak 3 ... see more